Subash Kumar Bhattarai

Subash Kumar Bhattarai

Profile ID RP-002-3125 Joined 2024-01-06 11 articles
0Connections
8
Total Views
11
Total Publications
233
Publication Views

Articles(11)

Authors: Subash Kumar Bhattarai, Diksha Dahal, Uttame Neupane

DOI: 10.46610/jorais.2024.v09i01.003

Volume9
Issue1
Pages25-44
Abstract

This study assesses compliance and welfare among construction workers at selected building construction projects in Kathmandu, examining implications for Labor Act implementation. Utilizing literature review and questionnaire surveys, data from 228 workers, with 99 in the sample, were analyzed. The questionnaire surveyed 31 special Labor Act provisions, employing dichotomous questions. Results show high worker awareness of rights under the Labor Act, notably regarding employer duties, non-discrimination, working hours, overtime, and safety. However, gaps exist in awareness regarding remuneration, transportation, and timely wage payment. Mann-Whitney U tests comparing male and female respondents revealed no statistically significant differences in scores, suggesting gender neutrality in compliance perceptions. Challenges in labor law enforcement, including insufficient mechanisms, resource constraints, and monitoring gaps, were identified. Recommendations include strengthening enforcement, enhancing awareness, capacity-building, and stakeholder collaboration. Continuous monitoring and evaluation are emphasized to ensure construction worker welfare in Kathmandu.

Authors: Anish Shrestha, Subash Kumar Bhattarai, Sushma Arayal, Puja Mishra

DOI: 10.46610/jwebm.2024.v05i01.001

Volume5
Issue1
Pages1-20
Abstract

A study conducted at the Himalayan Institute of Science and Technology (HIST) in Nepal explored entrepreneurial inclinations and characteristics among Civil Engineering students, aiming to achieve three objectives. Firstly, the study assessed entrepreneurial inclination among these students. Secondly, it examined demographic factors associated with entrepreneurial tendencies. Lastly, it identified and analyzed perceived entrepreneurial traits among engineering students. The study included students from all years of the Civil Engineering program, with over 80% responding to a questionnaire survey. Demographic analysis revealed a male majority across all age groups, with a significant portion falling within the 18-24 age range. Most fathers were engaged in occupations categorized as "Other," while mothers predominantly fell into the same category. Limited representation was observed in government sectors for both parents. Student engagement in extracurricular activities varied, with a notable increase in entrepreneurial activities among older age groups. T-test results highlighted gender disparities in certain areas, although both male and female students demonstrated entrepreneurial tendencies. These findings underscore the importance of entrepreneurial education and inform future research and policy decisions. T-test analyses further revealed nuanced insights into age groups and entrepreneurial aptitude, suggesting the need for tailored educational approaches. Successful entrepreneurship was associated with higher scores in networking, leadership, time management, and sales/marketing skills. The study emphasized the significance of adaptability, resilience, customer orientation, and efficient time management in entrepreneurship. These insights can inform entrepreneurship education programs, emphasizing key characteristics and addressing diverse perceptions among aspiring entrepreneurs. Further research is recommended to explore the underlying factors contributing to age-related entrepreneurial differences

Authors: Subash Kumar Bhattarai, Niraj Karmacharya, Sushma Arayal, Uttam Neupane, Gangesh Kumar Joshi

DOI: 10.46610/jocbme.2024.v010i01.002

Volume10
Issue1
Pages6-22
Abstract

In Nepal, traditional clay red bricks have been extensively used in residential and commercial construction, but their labour-intensive nature has prompted the exploration of alternative construction materials. This study investigates the feasibility of using interlocking blocks as a replacement for traditional bricks in residential housing, focusing on cost, strength, and socioeconomic acceptance. Through a combination of literature review, lab tests, and on-site observations, the properties of interlock blocks were evaluated and compared with traditional bricks. The study area, Setipakha Height in Lalitpur, provided a suitable context for data collection, given the prevalent use of interlock blocks in ongoing housing projects. Results from compressive strength tests revealed that interlock blocks exhibited comparable strength to both first- and second-class bricks, indicating their suitability for load-bearing applications. Additionally, interlock blocks demonstrated lower water absorption rates compared to clay bricks, suggesting enhanced durability and resistance to moisture-related issues. Furthermore, interlock blocks showed higher density and consistency, potentially offering greater structural integrity and material efficiency. Cost analysis indicated that interlock block masonry was more cost-effective than traditional brick masonry, with potential savings in construction time and labour requirements. Moreover, interlock blocks, when properly manufactured, could provide a sustainable alternative to traditional bricks, reducing environmental impact. In conclusion, interlock blocks present a promising alternative to traditional clay bricks in residential construction, offering advantages in terms of strength, durability, cost-effectiveness, and sustainability. Recommendations include the adoption of interlock blocks in construction projects, further research on their long-term performance, regulatory considerations, and increased awareness among stakeholders in the construction industry. Embracing interlock blocks has the potential to revolutionize residential construction practices in Nepal, contributing to sustainable development and meeting the housing needs of communities.

Authors: Bikash Bista, Uttam Neupane, Subash Kumar Bhattarai

DOI: 10.3126/hijase.v4i2.62188

Volume4
Issue2
Pages63-78
Abstract

The construction industry in Nepal is a significant contributor to the country's economy, but it faces challenges related to construction labor’s dissatisfaction. This study focuses on identifying the causes of dissatisfaction of construction labour during the building construction in Jajarkot. The primary objective of this study is to pinpoint and dissect the critical challenges that confront construction workers and, more importantly, to propose strategies aimed at enhancing their job satisfaction. The ultimate goal is to catalyse improvements in overall productivity and the successful completion of construction projects in the region. The study uses a mixed-method approach, including questionnaire, reports and research papers to gather data. The research identifies several key factors contributing to labour dissatisfaction, including delayed payment, inadequate compensation, inadequate wages, unsafe working conditions, excessive working hours and insufficient safety measures. These issues have a direct impact on construction labour motivation, affects their morale and well-being, leading to unhappiness, reduced productivity and reduced work excellence. The key recommendations include timely payments, improving compensation, enhancing working conditions, offering career growth prospects, promoting open communication, and recognizing workers' contributions. By adopting these measures, the construction industry can foster a positive work environment, leading to increased productivity and timely project completion.

Authors: Gangesh Kumar Joshi, Subash Kumar Bhattarai, Kishor Bhandari

DOI: 10.18231/j.jmra.2023.005

Volume10
Issue1
Pages21-32
Abstract

The supply chain plays a vital role in the successful completion of a construction project. Lack of proper supply chain management in any construction project results in cost overrun, time overrun, claims, disputes, and low productivity, which may ultimately lead to failure of the project. The overall objective of this study is to perform a comparative analysis of the need and importance of supply chain management based on stakeholders' perceptions of the selected building construction projects in Kathmandu valley. A total of thirty-four projects were taken for the study. Among these, 16 projects were executed by DUDBC and NRA, and 18 projects from private developers. The primary data collection tool used for the study was a questionnaire survey based on the Likert scale. A key informant interview along with a desk study was also conducted. The responses of questionnaires were ranked using the Relative Importance Index (RII). The findings were based on the comparison of views of public and private stakeholders on factors influencing the importance, challenges, and solutions of the problems of supply chain management. The findings show that both the public and private stakeholders agree on the high importance of proper supply chain management in the construction industry, but their perceptions differ on factors contributing to and benefits obtained from an efficient supply chain. Additionally, public and private stakeholders have differing opinions on the most pressing challenges facing supply chain management, its efficiency, and material management. Public stakeholders focused more on quality and delayed delivery of materials, while private stakeholders focused more on cost and efficiency issues. On the solutions and approaches for improvement of supply chain management, both the public and private sectors agree that improved integrated management between the supply chain and project site is essential to maintain a reliable and efficient supply chain. However, both stakeholders differ slightly on the approaches needed to improve supply chain management. Finally, the study shows that public and private stakeholders in building construction projects in Kathmandu agree that while major challenges exist in supply chain management, solving these problems through proper integration and communication will lead to an efficient and qualitative supply chain vital for a project's completion. Keywords: Supply chain management, Building construction projects, Private sectors, Public sectors

Authors: Subash Kumar Bhattarai

DOI: 10.24321/2456.9925.202112

Volume6
Issue4
Pages31-35
Abstract

Among the various tourist destination of Small world Nepal, Pokhara and Lumbini are the two most visited places by people, inside as well as outside the country. Pokhara, the beauty of Nepal serves as the capital of Gandaki Province. Pokhara is also considered as the tourism capital in Nepal. Within 30 kilometers (19 miles), the elevation rises from 850 to 7,500 meters. Among the total tourist entering Nepal, more than 20% of them visit PokharaLumbini, the birthplace of Gautam Buddha is a Buddhist pilgrimage site in Rupandehi District of Province - 5. Lumbini has several ancient temples, including the Mayadevi Temple and various new temples, funded by Buddhist organizations from various countries. Most of them have been completed while others are still under construction, which has been encouraging pilgrimage tourism in Nepal. Siddhartha highway connects Mahendra highway at Butwal with a total length of 181 m. It connects Pokhara and Lumbini. The road remains in such a terrible condition that even light vehicles cannot ply on it. Drivers have a hard time operating public buses on the route, as the potholes are so large that they have almost reduced the highway into a one-lane road.At present the travel time from Pokhara to Butwal through Siddhartha Highway is 6 hours with high number of bends increasing the chances of accidents on the road. There have been many cases of vehicles colliding and off-tracking from the road towards the river. To minimize the travel time as well as the distance of travel, we came up with an idea of “Pokhara - Butwal Expressway”.

Authors: Subash Kumar Bhattara

DOI: 10.24321/2393.8307.202107

Volume8
Issue3
Pages18-30
Abstract

Key Performance Indicators (KPI) in a construction project show how successfully the project has been executed. The information from the KPI measurement guides the implementer to collect the feedback which can be fed in for the new projects to be implemented. This study aim was to assess key performance indicators for health building construction, its ranking, the most important affecting factor for each KPI, and how to improving KPIs in a health building construction in Nepal. The data were collected from project stakeholders through a questionnaire survey. The project stakeholders were the contractors and health building section personnel of DUDBC. Data were summarized, analyzed, and presented in tables using Microsoft Excel. The study found that the stakeholders working in health building construction projects thought quality factor as the most important KPI with the first rank. The cost factor and time factor are correspondingly second and third-ranked, whereas, client satisfaction is the least important KPI. The study also showed the Relative Importance Index (RII) for the various factors affecting each KPI in the health building construction. For KPI-cost most important affecting factor is price escalation. For KPI-time it is the approved project schedule. The possible ways to improve the KPIs in health building construction are listed as conducting regular management meeting, implementing the provisions of the contract agreement, establishment of the proper communication system, timely monitoring of the progress, establishment of quality assurance and control system, adaptation of the cost and schedule control system, ensure the proper health and safety provisions to the workers, an early warning system for changes, regular updates of the work plan and program, regular training on project management, proper site management, proper management of manpower involved in the construction and better inventory management of contractors.

Authors: Gangesh Kumar Joshi

DOI: 10.24321/2456.429x.202202

Volume9
Issue3
Pages1-11
Abstract

Material management ensures timely, cost-effective project delivery.Every work required material management. Material managementstalls projects. Comparing public and private material management.The study aimed to improve material management in Kathmandu.Studying 34 projects. NRA and DUDBC performed 18. Primary datacame from questionnaires and interviews. Secondary data acquired.RAI ranked Likert answers (RII). Public and private sectors have similarbuilding material management attitudes, the study showed. Both sectorsagreed on a project timeframe, but are unhappy with their materialmanagement. Late materials slowed their projects. Both industries needa different material schedule and prefer ABC inventory planning andmaterial classification. Both sides sought a source visit. Public-privatesector discrepancies are found. The governmental sector emphasized“The source must be able to offer project-specific materials in theamounts,” whereas the private sector emphasized “The supplier mustalways be honest.” Private sector material management emphasizesplanning. Private builders prioritize quality, while governmental projectsemphasize price. Public projects favor timeliness above quality. Report:Both industries have poor material management. Procurement delays,waste, quality, and specification concerns plague public sector materialmanagement. Private sector concerns with supplier answers, shipping,and delivery. Possible solutions include developing a material scheduleto plan material requirements, validating items and locating suppliers,purchasing essential materials in advance before work begins, classifyingcommodities and managing inventories based on utilization value, andreducing overall material waste. Keywords: Material Management, Private Sector, Public Sector,ABC Method, Procurement, Existing gaps, Possible solution

Authors: Subash Kumar Bhattarai

DOI: 10.24321/2393.8307.202105

Volume8
Issue3
Pages1-8
Abstract

The objective of the research is to identify the inefficiencies in contract management practice in the SNRTP sub-projects and also the sources of these inefficiencies will try to find the probable solutions. To study the inefficiencies in contract management practice in SNRTP rural road projects, the checklist was prepared and data regarding the contract management were obtained with the project stakeholders. The data were collected using questionnaires, analysed using SPSS software, MS Excel and presented using the graph, table, and charts.The findings of the study showed that there are significant inefficiencies in contract management practice in the SNRTP project. It has been found that the majority of the respondents i.e. 79 percent of the experts interviewed opined that there are inefficiencies in the contract management practices in the rural road under SNRTP sub-projects, and only 21 percent think that the process is efficient from questionnaire survey. This has been statistically verified through descriptive statistics. The reason behind the inefficiencies in Contract Management Practice is mainly due to a lack of qualifications, knowledge, skills & experience of the contract management team, lack of cooperation & proper communication between project team member, lack of monitoring & evaluation in time, lack of timely meetings, slow decisions making, and improper planning & poor site management during the construction work. To overcome those inefficiencies some suggestions have been recommended as appointing the team member with proper qualifications, knowledge, skills & experience in the contract management. Proper communication & cooperation between team member, frequent inspection, monitoring and evaluation, completion of work within intended completion time, proper record keeping & timely issue management, and timely decision making from all stakeholders as required in construction work during the project implementation phase.

EXISTING SCENARIO OF BUILDING CODE IMPLEMENTATION IN NEWLY FORMED“NAGARJUN MUNICIPALITY” 2017

Authors: Subash Kumar Bhattarai, Anjay Mishra

Volume8
Issue11
Pages6751-6762
Abstract

Government of Nepal has enforced to implement the building code and bye-laws in all municipalities.So, implementation status of building code must be evaluated in newly formed municipality. Theresearch is focused to find the existing scenario of building code implementation through MandatoryRule of Thumb (MRT) along with adopted process, existing institutional mechanism, existing level ofawareness, capability, perspective and the % of various components of cost for building in newlyformed Nagarjun Municipality. The adopted process and existing institutional mechanism for theimplementation of building code is not effective due to lack of building code implementation sectionand non-functionality of environmental section and insufficient manpower. The awareness level ofstakeholders was found good regarding technical matter on building bye laws and building code. Thedesigners and local contractors were capable in implementing building code through trainings thoughthey realize need of trainings for continues improvement. Municipal engineers and technical manpowerwere academically sound though they lack relevant trainings for effective implementation of buildingcode and bye-laws. Due to awareness of house owner they were found positive for building code andbye-laws to have systematic construction with a view to reduce the impact of earthquake. Theimplementation of MRT was applied in permitted drawings and in construction also. The cost of aresidential building was found 21 % on an average for its structural component, 45 % for non-structuralcomponents and remaining 34% by content cost. Content cost depends on owner’s perspective but othertwo costs depend on MRT. It showed that % cost of structural component is less though it providesstructural strength in buildings.

Authors: Subash Kumar Bhattarai, Laxman Rayamajhi, Sanju Lamichhane, Sushma Arayal

DOI: 10.36344/utecem.2024.v02i01.004

Volume2
Issue1
Pages37-52
Abstract

The objective of the study was to find out the present scenario of delays of retrofitting of public building with case of 11projects of Kathmandu valley. An observation and study of the project document is carried out along with questionnaire survey with 50 respondents. The maximum rate of delay in the retrofitting project is found to be 167% time overrun and minimum is found to be 42% of time overrun. Only one project among them is within the schedule with physical progress of 22%. A multiple linear regression analysis was performed to examine the influence of the variables Time overrun (Months) and Time extension with respect to initial contract (%) on the variable Physical Progress. A model summary model is obtained as follows: Physical Progress = 0.57 + 0.02 * Time overrun (Months) - 0.15 * Time extension with respect to initial contract (%) The top ranked specific delay contributing factors in a retrofitting project are as found as Impractical project schedule and duration (frequent changes in critical path), Unavailability of the numbers and skilled workforce for retrofitting projects, Delays occurred due to lack of coherence in architectural, structural, electrical, sanitary, and HVAC drawings, Approvals of shop drawings submitted by the contractor and Unavailability of the specific materials as per BOQ.

No matching articles

Try another word from the title, author or DOI.

Brief Bio

No bio added yet.

Affiliations

Nothing added yet.

Education

Nothing added yet.

Honors & Awards

Nothing added yet.

Society Memberships

Nothing added yet.

Expertise

Nothing added yet.

Specialty

Nothing added yet.

Other Online Pages

Scholars in the same field

IH
Imtiyaz Hussain
0 publications
NA
Niyati Airan
Veer Chandra Singh Garhwali Government Institute of Medical Science and Research, Srinagar Garhwal, Uttarakhand.
0 publications
MR
Manjunath R Kudari
0 publications
MM
Muxammad Mahramov
JIZZAKH POLYTECHNIC INSTITUTE
0 publications
SK
Shiva Kumar
0 publications
NN
Nilam Navinbhai Pala
0 publications
DN
DEEPTHY NAIR
0 publications
AR
Ananta Raj Sharma
0 publications
ND
Dr Namrata Dogra
0 publications
VB
VasaviDevi Bysani
0 publications

Following

Nobody here yet.

Followers

Nobody here yet.

11 Publications

EXISTING SCENARIO OF BUILDING CODE IMPLEMENTATION IN NEWLY FORMED“NAGARJUN MUNICIPALITY”

Authors: Subash Kumar Bhattarai, Anjay Mishra

Published in 2017

0 Contributions

Nothing added yet.

Filter